The answer is 6√200, or on edge.
Now, we know that 90°< θ <180°, that simply means the angle θ is in the II quadrant, where sine is positive and cosine is negative.

the sum of the angles in a triangle = 180°, thus
x +
x +
x = 180
multiply through by 6
6x + 3x + x = 1080
10x = 1080 ( divide both sides by 10 )
x = 108
the angles are 108°, 54° and 18°
Since all the angles are different and the largest is 108°
The triangle is an obtuse scalene triangle
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
Answer:
.4!
Step-by-step explanation:
first you divide 20 by 125 and get .16
then you take the square root of .16 and get .4