It takes 42 minutes for 6 people to paint 7 walls
<em><u>Solution:</u></em>
It takes 54 minutes for 4 people to paint 6 walls
To find: Minutes required for 6 people to paint 7 walls
If
men can do
work in
days working
hours per day and
men can do
work in
days working
hours per day, then

M = Number of men
D = Number of days
H = Number of hours per day
W = Amount of work
Here in this sum,
<em><u>54 minutes for 4 people to paint 6 walls</u></em>

<em><u>Minutes required for 6 people to paint 7 walls</u></em>

<em><u>Substituting the values in formula, we get</u></em>

Thus it takes 42 minutes for 6 people to paint 7 walls
Answer:
39in.
Step-by-step explanation:
due to scale, cant be 15, as that would be the same length as other side
cant be 91 otherwise it wouldnt be similar if it had the same length as blue triangle which has 39 not 15 as the top side
Answer:
116.1
Step-by-step explanation:
If you round each decimal to the nearest tenth it would be 26.7 + 89.4 because you round up if it is 6 and above and round down for 5 and below. The rest is just simple addition.
Answer:
and 
Step-by-step explanation:
we know that
In the diagram
Triangles GRT and GEA are similar by AA Similarity Postulate
Remember that
If two figures are similar, then the ratio of its corresponding sides is proportional
so

we have




substitute

therefore


Answer:
A. -2/7
Step-by-step explanation:
slope = rise/run = 2/(-7) = -2/7