Answer:
0.00573
Explanation:
Cost of the bond today = $99.43
Value of bond at end of year = $100
Difference = $100 - $99.43 = $0.57
This $0.57 represents earnings on such bond value, that is yield on the bond.
Thus, yearly yield = $0.57/$99.43 = 0.00573
This value represents the discount rate of 1 year on $100 that is for which present value $99.43.
Final Answer
0.00573
Answer:
The options for this question are the following:
a. aid in product transformation
b. are a means of producing output
c. are a means of providing input into the process
d. all of these
The correct answer is d. all of these.
Explanation:
A supply chain is the set of activities, facilities and means of distribution necessary to carry out the process of selling a product in its entirety. This is, from the search for raw materials, their subsequent transformation and to the manufacture, transport and delivery to the final consumer.
In other words, the supply chain is a strategic and logistics function that involves all the operations that are essential for a merchandise to reach the final customer in optimal conditions.
Answer:
D. lower per unit cost of items produced on the line.
Explanation:
"The primary benefit of assembly lines is that they allow workers and machines to specialize at performing specific tasks, which can increase productivity. Large-scale assembly lines can allow for mass production of goods that would not be possible if products were made from start to finish by a single worker. The high productivity of mass production can also result in lower cost per unit produced than other manufacturing methods."
Reference: Hamel, Gregory. “Pros & Cons of Manufacturing Products With Assembly Lines.” Small Business - Chron.com, Chron.com, 21 Nov. 2017
Answer:
$46,800
Explanation:
Total overhead costs based on traditional systems of both products are: $52,000 +$78,000 = $130,000
Assuming that Perry Corporation applies the activity-based (setups and components) costing system instead of the traditional one, the overhead cost for the standard model can be calculated as following:
+) Overhead cost of each setup (for both products) = $52,000/(12 + 28) = $1,300
+) Overhead cost of each components (for both products)
= 78,000 / (8+12) = $3,900
=> Total overhead costs using activity - based costing system is:
<em>Total overhead costs = 1,300 x Number setups needed for standard model + 3,900 x Number of components needed for standard model</em>
<em>= 1,300 x 12 + 3,900 x 8 </em>
= $46,800
When expressing the relevant of cost in staying in dollar will be $<span>22500 in whole numbers. Staying in school when you are already in college is a challenge, because you are already one step forward to your success so it its hard to stop going to school, you need to do something so that you will be able to continue your schooling.</span>