Number one is -6 and 10
Number two is -55 and 4
The slope is 5/2. You can find the slope by using y2-y1/x2-x1. 7-2/6-4= 5/2.
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
Answer:
y = -(6+3x)/2
Step-by-step explanation:
♪\(*^▽^*)/\(*^▽^*)/
Answer:
D
Step-by-step explanation:
I got it right on the instruction
EDGENUTIY 2021