Particulars Steel Bars Titanium Bars
Units Per Batch 7000 3000
Hours Per Unit 1 1
Total Hours 7000 3000
Overhead rate on the basis of direct labor = Total Overhead / Total labor hours = 84,000/10,000 i.e 8.40
Overhead cost allocated to steel bars = 8.40*7000 = 58,800
Answer:
The correct answer is letter "C": might be estimated based on the experience of others or on engineering studies and judgment if the company does not have past experience with a similar asset.
Explanation:
A company's assets represent the<em> cash, patents, accounts receivable, equipment, plants, </em>and <em>land</em>, among others, useful for the firm to generate profit. When it comes to plant assets, they are considered fixed assets for cost accounting purposes and are nothing but the <em>land, buildings and machinery</em> useful for manufacturing.
<em>Calculating the useful life of a plant asset can be complicated and may require engineering studies. However, if the expertise of an employee is good enough to determine it the firm must take advantage of this strength but if there is nobody with this capability the institution should look for someone who does moreover when it does not have experience computing the useful life of such assets.</em>
Answer:
Debit Accounts Receivable, $225; credit Fees Earned, $225
Have a fantastic Day!
Answer:
EOQ = 72 units
Explanation:
Annual demand D = 1,286 units
Ordering cost S = $47
Holding percentage I = 35%
So, 0 - 199 units, the unit cost is $66
EOQ = 
EOQ = 
EOQ = 
EOQ = 72.33998613