9x-3x-5-3=2x-12
12x -8 =2x-12
-2x. -2x
10x. -8. =-12
+8. +8
10x. = -4
X = -0.4
So by looking at this equation you should look to see it's key features which will help you graph the equation. the first key feature is the slope, the slope lets you know the angle at which the line will be, the slope in an equation will always be the number multiplied by x ( in this case it'd be 3/4). The second feature is the y intercept, the y intercept is where the equations line crosses the y axis, the y intercept in a graph will always be what is added or subtracted after the x (in this case it'd be 3).
To simplify what I said look at the following:
Slope: 3/4
Y intercept: 3
Hope this helps!
Answer:
Prime numbers are whole numbers that are greater than 1 which only have factors of 1 and itself.
The area of the triangle is 1358 square feet
Step-by-step explanation:
Area = 1/2 (base * height)
Area = 1/2 (56 * 48.5)
Area = 1/2 (2716)
Area = 1358
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
2x+10=3x-15
25=x when simplified