Answer: It will take 7 days to use the inventory of shipping labels.
Step-by-step explanation:
Given : Total boxes shipped by warehouse worker per day = 25
Every box contains 3 shipping labels.
Inventory has 500 shipping labels.
Then, the total number of boxes can be made = (Total shipping labels) ÷ (labels in each box)
500 ÷ 3 =166.67≈166
Number of days it will take to use the inventory of shipping labels= (total number of boxes can be made) ÷ (Total boxes shipped per day)
= 166÷ 25=6.64≈7
Hence, it will take 7 days to use the inventory of shipping labels.
Answer:
I think it’s parallel
Step-by-step explanation:
Correct me if this is wrong
Answer:
x = 19
the angles individually equal 39
Step-by-step explanation:
Answer:
Answer is c
Step-by-step explanation:
In hypothesis testing whether to accept or reject null hypothesis, normally we find one method as using confidence interval. If the test statistic lies within confidence interval, we accept otherwise we reject.
For arriving confidence intervals we add and subtract margin of error from the mean we use in null hypothesis.
Margin of error = std error * critical value of test (Z or t etc)
For the same std deviation, std error = std dev/sq rt of sample size
Thus std error is inversely proportional to the square root of sample size.
If n becomes larger, std error becomes smaller and vice versa.
So margin of error increases for smaller sample size.
Since we have to select confidence level from a small sample, we have to select one which has the greatest margin of error=18
Hence answer is
c) 71%(+/-18%)