Answer:
x = -0.2
Step-by-step explanation:
Cross multiply
9* 0.2(6x + 1) = 3.6 * 0.5x Combine the coefficients on the right.
1.8 (6x + 1) = 1.8 x Remove the brackets on the left
1.8*6x + 1.8 = 1.8x Multiply the factors on the left. Don't do anything with the plus sign
10.8x + 1.8= 1.8x Subtract 1.8 from both sides
10.8x = 1.8x - 1.8 Subtract 1.8x from both sides
10.8x - 1.8x = -1.8
9x = - 1.8 Divide by 9
x = -1.8/9
x = - 0.2
Check
This is one question you should check. There's lot's of room for an error.
<em><u>LHS</u></em>
0.2(6x+1)/3.6
0.2(6 * -0.2 + 1) / 3.6
0.2( - 1.2 + 1) / 3.6
0.2( - 0.2) / 3.6
- 0.04 / 3.6
- 0.011111111
<em><u>RHS</u></em>
0.5 ( - 0.2)/9
-0.1/ 9
- 0.0111111 And the left and right side check.
Answer:
Answer is A,C, and D
Step-by-step explanation:
Answer:
It will take 3.214 minutes.
Step-by-step explanation:
<em>It is given that, the conveyor belt transports 300 cans in 5 mins and the smaller belt transports 300 cans in 9 minutes.</em>
Thus , the speed of conveyor belt is,
= 
and of smaller belt is,
= 
Thus, when both are used together,
<em>conveyor belt will transport (60)(t) cans and smaller belt will transport
(t) cans per minute.</em>
Thus the equation becomes,

t = 
The answer is... Five less than C
Answer:
the answer is "B" the second one...
(1/2)(2)^x
at
0 = (1/2)(1) = 1/2
2= (1/2)(4) = 2
Step-by-step explanation: