Answer:
takeoff
Explanation:
Is the third stageof economic development in which rapid economic growth occurs, theeconomy diversifies from few industries to several industries.
Answer:
Don executes a will leaving half of his farm to his spouse Elsie and the rest to his sons, Frank and Greg, in equal shares. The will disinherits a third son, Hal. Don and Elsie divorce, but Don dies before changing his will. Under the Uniform Probate Code:
c. Frank and Greg receive the entire estate in equal shares.
Explanation:
- Uniform Probate Code is applicable in almost 18 states of the United States that was developed to standardize the laws of wills, trusts, and intestacy.
- The option a is not correct as Elsie can't get the half of the farm as Don and Elsie were divorced.
- The option b is also incorrect as Elsie can't get the half of farm as well as Hal will not get the share.
- The option c is correct as it is in accordance with Uniform Probate Code.
- The option d is incorrect as state can't inherits the entire estate in the presence of heirs.
Answer:
D. The outlet substitution bias injects an upward bias into the CPI
Explanation:
Answer:
False
Explanation:
The contribution margin will be higher for the company with the highest fixed expenses. Contribution margin = selling price - variable cost
For example:
Company A Company B
sales price per unit $100 $100
total costs per unit $80 $80
variable costs per unit $50 $40
<u>fixed costs per unit $30 $40 </u>
contribution margin $50 $60
Answer:
29.71 per machine-hour
Explanation:
Buker corporation has an estimated machine hours of 74,000
The estimated variable manufacturing overhead is 7.67 per-machine hour
The estimated total fixed manufacturing overhead is $1,630,960
The first step is to calculate the estimated overhead cost
= (74,000×7.67) + $1,630,960
= 567,580 + $1,630,960
= $2,198,540
Therefore, the predetermined overhead rate can be calculated as follows
Predetermined Overhead rate= Estimated manufacturing overhead cost/Estimated machine hours allocated
= $2,198,540/74,000
= 29.71 per machine-hour
Hence predetermined overhead rate for the recently completed year was closest to 29.71 per machine-hour