The first thing to do in this case is to find the number of inches of wall hanging that the artist needs to weave. We have then 60-18 = 42 inches Then, as each day the artist can weave two inches, then the number of days will n = (42) / (2) = 21 days answer it will take 21 days the artist to finish the hanging wall