1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Reika [66]
3 years ago
7

GIVING 100 POINTS FOR THE FIRST CORRECT ANSWER

Mathematics
1 answer:
Wittaler [7]3 years ago
4 0
Mrs. Walters gets 14.4 miles per gallon.
Mr. Walters gets 15 miles per gallon.
So Mr. Walters car is better because he gets more miles out of one gallon of gas.
360/25=14.4 480/32=15
Stephen can read 90 pages in 6 days witch means he reads 15 pages per day. Which means it will take him 20 days to read a 300 page book.

90/6=15 300/15=20
You might be interested in
The value of 5 in the number 357.21 is
aliina [53]
The value is 5 tens because the 5 is in the tens place
5 0
3 years ago
The process standard deviation is 0.27, and the process control is set at plus or minus one standard deviation. Units with weigh
mr_godi [17]

Answer:

a) P(X

And for the other case:

tex] P(X>10.15)[/tex]

P(X>10.15)= P(Z > \frac{10.15-10}{0.15}) = P(Z>1)=1-P(Z

So then the probability of being defective P(D) is given by:

P(D) = 0.159+0.159 = 0.318

And the expected number of defective in a sample of 1000 units are:

X= 0.318*1000= 318

b) P(X

And for the other case:

tex] P(X>10.15)[/tex]

P(X>10.15)= P(Z > \frac{10.15-10}{0.05}) = P(Z>3)=1-P(Z

So then the probability of being defective P(D) is given by:

P(D) = 0.00135+0.00135 = 0.0027

And the expected number of defective in a sample of 1000 units are:

X= 0.0027*1000= 2.7

c) For this case the advantage is that we have less items that will be classified as defective

Step-by-step explanation:

Assuming this complete question: "Motorola used the normal distribution to determine the probability of defects and the number  of defects expected in a production process. Assume a production process produces  items with a mean weight of 10 ounces. Calculate the probability of a defect and the expected  number of defects for a 1000-unit production run in the following situation.

Part a

The process standard deviation is .15, and the process control is set at plus or minus  one standard deviation. Units with weights less than 9.85 or greater than 10.15 ounces  will be classified as defects."

Previous concepts

Normal distribution, is a "probability distribution that is symmetric about the mean, showing that data near the mean are more frequent in occurrence than data far from the mean".

The Z-score is "a numerical measurement used in statistics of a value's relationship to the mean (average) of a group of values, measured in terms of standard deviations from the mean".  

Solution to the problem

Let X the random variable that represent the weights of a population, and for this case we know the distribution for X is given by:

X \sim N(10,0.15)  

Where \mu=10 and \sigma=0.15

We can calculate the probability of being defective like this:

P(X

And we can use the z score formula given by:

z=\frac{x-\mu}{\sigma}

And if we replace we got:

P(X

And for the other case:

tex] P(X>10.15)[/tex]

P(X>10.15)= P(Z > \frac{10.15-10}{0.15}) = P(Z>1)=1-P(Z

So then the probability of being defective P(D) is given by:

P(D) = 0.159+0.159 = 0.318

And the expected number of defective in a sample of 1000 units are:

X= 0.318*1000= 318

Part b

Through process design improvements, the process standard deviation can be reduced to .05. Assume the process control remains the same, with weights less than 9.85 or  greater than 10.15 ounces being classified as defects.

P(X

And for the other case:

tex] P(X>10.15)[/tex]

P(X>10.15)= P(Z > \frac{10.15-10}{0.05}) = P(Z>3)=1-P(Z

So then the probability of being defective P(D) is given by:

P(D) = 0.00135+0.00135 = 0.0027

And the expected number of defective in a sample of 1000 units are:

X= 0.0027*1000= 2.7

Part c What is the advantage of reducing process variation, thereby causing process control  limits to be at a greater number of standard deviations from the mean?

For this case the advantage is that we have less items that will be classified as defective

5 0
3 years ago
On a number line, suppose point E has a coordinate of 4, and EG = 11. What are the possible coordinates of point G?
navik [9.2K]

Answer:

  -7, 15

Step-by-step explanation:

The positive difference between E and G is 11.

<h3>Solution</h3>

  G - E = 11

  G = 11 + E = 11 + 4

  G = 15 . . . . . . . . . . . . . when G is right of E

__

  E - G = 11

  E - 11 = G = 4 - 11

  G = -7 . . . . . . . . . . . . when G is left of E

Possible coordinates for G are -7 and 15.

4 0
2 years ago
How can I prove mathematically that (a / b) + (c / d) = (ad + bc) / bd
wlad13 [49]

Step-by-step explanation:

(a/b) + (c/d)

Find the common denominator.  In this case, bd.  So multiply the first fraction by d/d, and the second fraction by b/b.

(ad)/(bd) + (bc)/(bd)

Add the fractions.

(ad + bc) / (bd)

7 0
3 years ago
Jed made 2 free throws in 5 second how many would he make in one minute
Nataly_w [17]
12 free throws per minute
4 0
3 years ago
Read 2 more answers
Other questions:
  • A video sharing website starts with 20,000 members. Each year it loses 25% of the members, but adds 10,000 new members after the
    8·1 answer
  • Evaluate the expression when a = 3.
    10·2 answers
  • Trapezoid A B C D is shifted down and to the left to form trapezoid A prime B prime C prime D prime. Trapezoid A prime B prime C
    15·2 answers
  • 80 to 60 as a fraction
    12·2 answers
  • Find the value of x for which / || m
    14·1 answer
  • Shiloh and her friends spent the day at an amusement park. In the first hour, they rode two rides. After 2 hours, they had ridde
    8·1 answer
  • )If there are 6 builders, it takes 80 days to complete the house. How many builders must be employed to build the house in just
    7·1 answer
  • PLS HELP GIVING BRAINLESS TO CORRECT PERSON PLS HELP ASAP
    10·1 answer
  • PLZ SHOW WORK 250 POINTS<br><br> how do you do 1/4 x 750,000
    11·2 answers
  • Convert 5031centimeters to inches
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!