Answer:
Canceled checks.
Invoices.
Cash register receipts.
Computer-generated receipts.
Credit memo for a customer refund.
Employee time cards.
Deposit slips.
Purchase orders
Explanation:
That is all i think
Answer:
- <em><u>C. Drive at the posted speed limit</u></em>
Explanation:
The answer choices for this question are:
- A. Keep alert and watch out for construction barrels or cones
- B. Slow down even if you don't think you'll hit a road worker
- C. Drive at the posted speed limit
- D. Keep as much distance as you can while navigating around them
Since the conditions of the road are not the best, you should drive below the posted speed of limit.
The only presence of workers on the road represent a risk for them and for you.
The number of lanes are reduced, the road could present potholes, dirt, stones, or even some substances that make the pavement slippery. You could not have good visibility.
All those risks make that you have to be extremely careful, reduce your speed, lower than than the posted speed limit.
Thus, you should:
- A. Keep alert and watch out for construction barrels or cones
- B. Slow down even if you don't think you'll hit a road worker
- C. <u>NOT </u>drive at the posted speed limit
- D. Keep as much distance as you can while navigating around them
Answer:
$242,000
Explanation:
Calculation of the total amount of manufacturing overhead actually incurred:
Particulars Amount
Indirect Materials $42,000
Indirect labor $101,000
Depreciation On factory equipment $42,000
Additional Manufacturing Overhead <u>$57,000</u>
Total Manufacturing Overhead incurred <u>$242,000</u>
Answer:
A
Explanation:
This seems the most reasonable depending on the interview....if it was for a job then you might need something that is not done with your legs
Answer:
$312,000
Explanation:
Given that,
August Sales = $300,000
July sales = $330,000
Customer amounts on account are collected 60% in the month of sale and 40% in the following month.
Cash Receipts during August:
= (August Sales × 60%) + (July Sales × 40%)
= ($300,000 × 60%) + ($330,000 × 40%)
= $180,000 + $132,000
= $312,000
Therefore, the cash is budgeted to be received during August is $312,000.