Answer:
165.
Step-by-step explanation:
The nth term is an = a1 + (n - 1)d.
The common difference (d) is 7 and the first term (a1) is -3, so the 25th term
= a25 = -3 + (25-1)*7
= =3 + 24*7
= 165.
<u>Answer: </u><em><u>h=80 is the final answer. *The answer must be have a positive sign.*</u></em>
Explanation:
<em><u>Switch sides of an equation.</u></em>
<em><u>3/4h=60</u></em>
<em><u>multiply by 4 both sides of an equation.</u></em>
<em><u>4*3/4h=60*4</u></em>
<em><u>simplify.</u></em>
<em><u>3h=240</u></em>
<em><u>divide by 3 both sides of an equation.</u></em>
<em><u>3h/3=240/3</u></em>
<em><u>simplify.</u></em>
<em><u>240/3=80</u></em>
<em><u>80*3=240</u></em>
<em><u>3*80=240</u></em>
<em><u>240/80=3</u></em>
<em><u>h=80</u></em>
<em><u>Hope this helps!</u></em>
<em><u>Thanks!</u></em>
<em><u>Have a great day!</u></em>
Answer:
foot marker 320 at t=0
Step-by-step explanation:
8 sec x 85 ft/s =680 ft
1,000ft - 680 ft = 320 ft
The slope-intercept form: y = mx + b
m - a slope
b - y-intercept (0; b)
-y + 8x = 2x |subtract 8x from both sides
-y = -6x |change signs
y = 6x
Answer: The slope m = 6, y-intercept b = 0 -> (0; 0).
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates