Consider three branch prediction schemes: predict not taken, predict taken, and dynamic prediction. Assume that they all have ze
ro penalties when they predict correctly and two cycles when they are wrong. Assume that the average predict accuracy of the dynamic predictor is 90%. Which predictor is the best choice for the following branches? [1.5 pts]a. A branch that is taken with 5% frequencyb. A branch that is taken with 70% frequencyc. A branch that is taken with 95% frequency
1. When a branch is taken with 5% frequency, the branch prediction scheme is "predict taken" because the process has to begin fetching and then execute at the target address.
2. When a branch is taken with 95% frequency, the branch prediction scheme is "predict not taken" because the branch outcome is definitely known.
3. When a branch is taken with 70% frequency, the prediction scheme is "dynamic prediction" the branch prediction can dynamically change during the program execution.
if two 1.5 ya alt batteries are connected to head to the tail the voltage is 3.0 volt it is the because the battery is insidious reduce a voltage equal to number of battery is multiplied by the voltage of individual