Sound (like music and background sound) and detail. The music and background sound is what sets the mood for the game. In horror games, the sound is sometimes uneasy to make the player feel anxious, and when something chases you the music turns into fast-pace and making the player scared and feel that adrenaline. The detail also is a great factor. The more realistic a game is, the more it feels like real life and determines if the player will get a real reaction from the game.
Answer:
<em>the % recovery of aluminum product is 80.5%</em>
<em>the % purity of the aluminum product is 54.7%</em>
<em></em>
Explanation:
feed rate to separator = 2500 kg/hr
in one hour, there will be 2500 kg/hr x 1 hr = 2500 kg of material is fed into the machine
of this 2500 kg, the feed is known to contain 174 kg of aluminium and 2326 kg of rejects.
After the separation, 256 kg is collected in the product stream.
of this 256 kg, 140 kg is aluminium.
% recovery of aluminium will be = mass of aluminium in material collected in the product stream ÷ mass of aluminium contained in the feed material
% recovery of aluminium = 140kg/174kg x 100% = <em>80.5%</em>
% purity of the aluminium product = mass of aluminium in final product ÷ total mass of product collected in product stream
% purity of the aluminium product = 140kg/256kg
x 100% = <em>54.7%</em>
Answer:
a) 1.16 m/s
b) 1/216000
c) (√15)/6480000
Explanation:
The parameters given are;
Length of boat prototype, lp = 30 m
Speed of boat prototype = 9 m/s
Length of boat model, lm= 0.5 m
a) lm/lp = 0.5/30 = 1/60 = ∝
(vm/vp) = ∝^(1/2) = √∝ = (1/60)^(1/2)
vm = 9 × (1/60)^(1/2) = 1.16 m/s
b) The ratio of the model to prototype drag, Fm/Fp, is given as follows;
Fm/Fp = (vm/vp)²×(lm/lp)² = ∝³
Fm/Fp = (1/60)³ = 1/216000
c) The ratio of the model to prototype power pm/p
= (Fm/Fp) × (vm/vp) = ∝³×√∝
The ratio of the model to prototype power pm/p
= √(1/60) × (1/60)³
pm/p
= √(1/60) × (1/60)³ = (√15)/6480000
Answer:
28.6 kg
Explanation:
The final weight can be calculated from the mixing data and formulae which is given as follows:
cement content = 
Computing the parameters and checking the tables gives 28.6 kg.