Answer:
(2x^3+4x^2-4x+6) / (x+3) = 2x^2-2x+2 => B
Step-by-step explanation:
The formula of the length of the segment AB:

We have:

Substitute:

Answer:
B) 10.
Answer:
480 Litres
Step-by-step explanation:
Percentage increase = 20% × 400
New value =
400 + Percentage increase =
400 + (20% × 400) =
400 + 20% × 400 =
(1 + 20%) × 400 =
(100% + 20%) × 400 =
120% × 400 =
120 ÷ 100 × 400 =
120 × 400 ÷ 100 =
48,000 ÷ 100 =
480
Answer:
The z-score for this length is of 1.27.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
One-year-old flounder:
Mean of 127 with standard deviation of 22, which means that 
Anna caught a one-year-old flounder that was 155 millimeters in length. What is the z-score for this length
This is Z when X = 155. So



The z-score for this length is of 1.27.
Answer: 5
Step-by-step explanation:
Range = highest value - lowest value
The highest value from the data set given = 1
The lowest value = -4
Therefore :
Range = 1 - (-4)
Range = 1 + 4
Range = 5