Answer:
12,760,000 in scientific notation

Answer:
97.8%
Step-by-step explanation:
110 is 2 standard deviations above the mean (6+6 = 12)
12+98 = 110
Looking at the standard deviation curve
P(x< or = to 110) = 1 - P(x>110)
We can find the probability that x>100 by adding anything above 2 standard deviations above the curve.
P(x>110) = 2.1+.1 = 2.2%
P(x< or = to 110) = 1 - P(x>110)
= 1- 2.2%
= 1- .022
= .978
= 97.8 %
I believe it is irrational. The answer comes out to 4.942809041582063......
For AB to be parallel to DC based on the diagram, angle AWZ must be equal to angle WZY.
But in the diagram shown, angle AWZ is equal to angle XYC and we are not told that WZ is parallel to XY.
Therefore his error is that he misapplied the alternate angle property.