Answer:
(53.812 ; 58.188) ; 156
Step-by-step explanation:
Given that :
Sample size (n) = 51
Mean (m) = 56
Standard deviation (σ) = 9.5
α = 90%
Using the relation :
Confidence interval = mean ± Error
Error = Zcritical * (standard deviation / sqrt (n))
Zcritical at 90% = 1.645
Error = 1.645 * (9.5 / sqrt(51))
Error = 1.645 * 1.3302660
Error = 2.1882877
Hence,
Confidence interval :
Lower boundary = 56 - 2.1882877 = 53.8117123
Upper boundary = 56 + 2.1882877 = 58.1882877
Confidence interval = (53.812 ; 58.188)
2.)
Margin of Error (ME) = 1.25
α = 90%
Sample size = ((Zcritical * σ) / ME)^2
Zcritical at 90% = 1.645
Sample size = ((1.645 * 9.5) / 1.25)^2
Sample size = (15.6275 / 1.25)^2
Sample size = 12.502^2 = 156.3000
Sample size = 156
Answer: 28 hours
Step-by-step explanation:
Hi, the cost for the trampoline park without a membership is equal to the price of the jump tickets per hour (12) multiplied by the number of hours (h).
Cost without membership= 12h
With the membership the price of each jump ticket has a 15% discount ( so, 100-15 =85% of the total price ). To calculate the cost for this case we have to add the cost of the membership 50, and multiply the cost of each jump ticket (12) by 0.85 (percentage in decimal form)
Cost with membership = 50 +12 (0.85) h
If both cost are equal:
50 +12 (0.85) h = 12 h
Solving for h
50+10.2h =12h
50= 12h-10.2h
50= 1.8h
50/1.8= h
27.78 =h
h =28 (rounded)
Answer:
About 30
Step-by-step explanation:
The value 239.63 rounds to 240
The value 7.51 rounds to 8
Divide 240 over 8 and we get 240/8 = 30
Angle 1 and 2 are vertical angles
Hope this helps :)