Answer:
The number of FTE needed to be hired to cover the additional procedures per 7.5 day work is:
= 1.
Step-by-step explanation:
a) Data and Calculations:
Endoscopies EP Studies Total
Projected number of studies 60 5 65
Time in minutes for per study 5 15
Total time required (in minutes) 300 75 375
Full-time Employee (FTE) works 7.5-hour day or 450 minutes (7.5 * 60) per day.
b)The number of full-time employees (FTE) needed to be hired to cover the additional procedures per 7.5-day work is 1. The FTE has 450 minutes available for the additional procedures. She will only require 375 minutes. Therefore, she has extra (idle) time of 75 (450 - 375) minutes per workday.
Slope= -3/2
Y-intercept=33/2
Answer:
3x
Step-by-step explanation:
Answer: There are 56 boys in the 10th grade
Step-by-step explanation:
Step 1
ratio of boys to girls in the 10th grade is 8 :13
Number of girls= 91
To find the number of boys, we first find the total number of boys and girls in the 10th grade
Step 2
Now the total ratio= 8 +13=21
Number of girls = ratio of girls/ total ratio x Total number of students
91=13/ 21 x Total number of students
Total number of students =21 x 91 / 13 =147
Step 3
Therefore Number of boys =ratio of boys/ total ratio x Total number of student
8/21 x 147=56