Answer:
y=5/4x + 2
Step-by-step explanation:
Ok so in the point (-4,-3) -4 is x and -3 is y. Now, since you have the slope, 5/4, you can put it into an equation. -3= 5/4(-4) + b. When you multiply 5/4 x -4 you get -3=-5 + b so then add 5 to both sides to get rid of it and you have 2=b. And your equation would be y=5/4x + 2
Answer: Third option is correct.
Step-by-step explanation:
Since we have given that
Total watches in an inventory = 1000
Number of shipments sent out = 168, 231, 411
So, Remaining inventory of watches would be :

New receipts = 21, 145 and 11
So, Number of watches on hand becomes :

Hence, Third option is correct.
Answer:
25.5 mph
Step-by-step explanation:
So Bradley's speed can be modeled by the equation y=2x+40 where y=speed, x=time in hours after noon, and b=initial speed
So 12:15 is 15 minutes after noon, which is also 0.25 or 1/4 of an hour after noon. This is the x-value. Plug this into the equation to get his speed at 12:15
y=2(0.25)+40
y=0.5+40
y=40.5
So his speed was 40.5 at the time and since he was going 15 miles over the speed limit, the speed limit is 15 less than his speed
40.5 - 15 = 25.5