Answer:
Every time a new piece of equipment is added to the system, if ifs not properly optimized within the scope of the entire system, you'll end up with wasted energy and operational inefficiencies
12+4+9+13+7+11+5+2+_+_ /10= 8
x10 both sides
12+4+9+13+7+11+5+2+_+_=80
63+_+_=80
-63 both sides
_+_= 17
any two numbers that add up to 17 can go in the planks
7,10
Answer:
It would be -13.6
Step-by-step explanation:
I used my calculator for this,
-24.65 +25 - 46.75 + 32.80 = -13.6
Answer:
x = 56
Step-by-step explanation:
The answer would be 1.40. The 3 significant figure are 1.39 and it wants us to round so we look at the 8 in 1.3981 and since 8 > 5 we know to round up.