Award documentation is typically required to be prepared and submitted within how long after the end of a project period of 90 days.
What does Award includes?
- Awards to international organizations and government institutions, whether or whether they are covered by SNAP, must include annual expenditure information.
- The report shall be submitted for each budget period, if necessary on an annual basis, no later than 90 days following the end of the calendar quarter in which the budget period concluded.
- The report must include information on any allowed extensions to the budgetary period. If more regular reporting is necessary, both the frequency and the deadline shall be stated in the NoA.
Learn more about the Post-Award Monitoring and Reporting with the help of the given link:
brainly.com/question/15415195
#SPJ4
Answer:
Similar to a While loop, a For loop consists of three parts: the keyword For that starts the loop, the condition being tested, and the EndFor keyword that terminates the loop.
Explanation:
Loop statements usually have four components: initialization (usually of a loop control variable), continuation test on whether to do another iteration, an update step, and a loop body.
Answer:
The new root will be 2.
<em></em>
Explanation:
The binary tree is not properly presented (See attachment)
To answer this; first, we need to order the nodes of the tree in a pre-order traversal.
We use pre-order because the question says if something is removed from the left child.
So, the nodes in pre-order form is: 14, 2, 1, 5, 4, 16.
The root of the binary tree is 14 and if 14 is removed, the next is 2.
<em>Hence, the new root will be 2.</em>
Answer:
Phantom inspection is the process of finding various defects in the documents according to the . Basically, it is a group of meeting that usually provide the synergy effects and the maximum defects can easily be detected. This entire process is known as phantom inspector.
It is also made some assumptions regarding the inspection that is made by one and more than one individual.
This process are usually done by inspecting the each operation output with the given output requirements.