1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
sattari [20]
3 years ago
15

3. Your teacher wants to make sure everyone has a pencil for class. She has 104 students in all of her classes. The office gave

her 4 boxes of pencils. How many pencils were in each box if each of her students receives 1 pencil? Question 3 options: A 26 B 25 C 100 D 50
Mathematics
2 answers:
hoa [83]3 years ago
8 0
104 / 4 = 26 boxes <===
Marianna [84]3 years ago
5 0
A because 104 divided by 4 equals 26. A is the correct answer
You might be interested in
A guy wire supports an antenna tower, as shown at the right. The bottom of the wire is secured in the ground 30 feet from the ba
babunello [35]

Answer:

The wire is approximately 42feet long

Step-by-step explanation:

We can mentally sketch out the shape that is formed between the guy wire and the antenna tower. This is simply a right-angled triangle with the opposite side being the height of the antenna (30 feet). The adjacent side is the distance on the ground between the point where the wire was fastened and the base of the antenna.

The hypotenuse side is the length of the wire we are looking for.

Parameters are given as:

Opposite : 30ft

Adjacent: 30ft

Hypotenuse: x feet

The hypotenuse = \sqrt{opp^2 + adj^2}

Hypotenuse =\sqrt{30^2+ 30^2} \approx 42ft

5 0
3 years ago
Help me please. I really neeed it
PSYCHO15rus [73]

Answer: You need to put the same shape as it shows there on the top.

Step-by-step explanation: I hope this helped you.

5 0
2 years ago
cehgg A costing system that first assigns costs to activities and then to products is a.job-order costing. b.activity-based cost
Ronch [10]

Answer:b.activity-based costing.

Step-by-step explanation: Activity-based costing is a costing system that first talkies or identifies the activities that are involved in the Manufacturing or in a particular process and them assigns cost to such activities. This type of costing gives high premium or focus on the activities as it assigns cost to products based on the activities that led to the production of the products.

THIS TYPE OF COSTING IS ALSO KNOWN AS ABC APPROACH TO COSTING IT FIRST ASSIGN RESOURCES TO ACTIVITIES AND FROM ACTIVITIES TO PRODUCTS BASED ON THE CONSUMPTION ESTIMATES.

8 0
3 years ago
EASY QUESTION
Zanzabum

Answer:

im pretty sure it's P({x:x is oven-baked apple & lavender calzone })

Step-by-step explanation:

its the one with the biggest section

8 0
3 years ago
A die is rolled. Match the events mentioned in the first column with their corresponding probability.
lakkis [162]

Answer:

Step-by-step explanation:

a number greater than 5 - 1/6

a prime number - 1/2

a number greater than 4 - 1/3

a number less than 6 - 5/6

4 0
3 years ago
Other questions:
  • A matchbox tray slides into its outer cover in how many different ways can you do this
    7·1 answer
  • In order to estimate the average time spent on the computer terminals per student, data were collected for a sample of 49 busine
    7·1 answer
  • Need help ASAP just with part b and c.
    8·1 answer
  • Having some trouble helppp.
    13·2 answers
  • Solve the differential equation. y' + 5xey = 0.
    6·1 answer
  • How do you find the inverse of a function?
    7·1 answer
  • How munch dose cups go in pints
    13·2 answers
  • Compare 1/2 5/10 using &lt;, &gt;, or =
    12·2 answers
  • Rebecca and Megan are shopping at a store that sells jewelry, scarves, and purses. The cost of all the items at the store includ
    9·1 answer
  • Find the solution of the inequality
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!