Answer:
The bottom question is wrong. You have to multiply 8 to get the amount earned. But the rest is correct.
Step-by-step explanation:
6.25 x 8 = 50
12.5 x 8 = 100
18.75 x 8 = 150
25 x 8 = 200
31.25 x 8 = 250
During 7 hours: 28 parts assembled
during 14 hours: 56 parts assembled
during 21 hours: 84 parts assembled
during 28 hours: 112 parts assembled
during 35 hours: 140 parts assembled
Answer:
-2 and -7
Step-by-step explanation:
This problem is about using the Factoring X.
Two numbers will multiply to the number placed at the top. These same two numbers will add to the value placed on the bottom.
Let's look at the factors of 14.
1 • 14 = 14
2 • 7 = 14
Now let's look at their sums.
1 + 14 = 15
2 + 7 = 9
We can see that 2 and 7 multiply to 14 and add to 9.
However, we need them to add to -9.
Note that two negative numbers multiplied will become positive.
-2 • - 7 = 14
Now let's look at their sum.
-2 + (-7)
Simplify the negative.
-2 - 7 = -9
We can see that -2 and -7 multiply to 14 and add to -9.
Hope this helps!
Answer:
P = $240,000 – $196,000 = $44,000.
The expected value is a weighted average of each possible value weighted by its probability.
EV = ($44,000)(0.75) + ($–196,000)(0.25) = $–16,000.
The expect average profit is $–16,000.
The company should not make the product.
Step-by-step explanation:
ED