Answer: $48
If she tipped $8.00 then the original bill was $40, and the total was $48
Answer: 120 days
Step-by-step explanation:
A can complete it in 16 days.
=100/16 =6.25%/day.
B has ten days to do it.
10% every day is equal to 100/10.
So they would each contribute 16.25 percent per day as a group.
then for six days,
16.25*6 =97.50percent
97.50% of the work has been finished, in other words.
The amount of work left is now 100-97.5 = 2.5.
C finishes up the remaining job in 3 days
3.5% in 3 days, to be exact.
Consequently, he will finish his entire project in 120 days.
[2.5 * 40 = 100 percent; 40 * 3 = 120 days]
Answer:
for 9, the answer is 246.49
Step-by-step explanation:
This is area of a circle correct?
The formula is PI x radius squared.
3.14 x the radius, which is 5, squared
I am re-editing this
so sorry the answer is actually 78.54
The reason why it is 78.54 is that you need to square the radius before multiplying with PI.
Since there are 2 sides to the shelf, there is 0.05*2=0.05+0.05=0.1 meters of space between the shelf and wall in total. Next, since each piece of wood is 0.3 meters wide and we have 3 of them, the total width of the wood is 0.3+0.3+<something>
Note that <width of wood>+<space between shelf and well> =width of closet
I challenge you to finish this on your own - good luck, and feel free to ask with any further questions!
Answer:
An account in which money must stay deposited for a certain amount of time.
Step-by-step explanation: