Answer:read
Explanation:
airpods
headphones
earbuds
AirPods pro
watch
fitbit (type of watch that counts your miles) &you can say workout watch&
VR set
technology bracelet
smart glasses
Smart ring
It will take 8 times more time to sort a 40-element list compared to the time spent on a 5-element list.
We can arrive at this answer as follows:
- We can see that if we divide a group of 40 elements into groups containing 5 elements, we will have 8 groups.
- In this case, the time it would take to sort the list of one group of 5 elements would be repeated 8 times so that we could sort all the groups and their elements.
Another way to do this is to divide the number 40 by 5. We would have the number 8 as a result, which indicates that we would need 8 times more time to sort a list of 40 elements, compared to a list of 5 elements.
You can get more information about lists at this link:
brainly.com/question/4757050
Answer:
<u>Parametric design</u> involves engineers building up a 3D geometry piece by piece. 2D sketches turn into 3D features, with constraints and relations duly applied to fit the designer's intent.
Explanation:
Hope this helps