Answer:
Step-by-step explanation:
The plot chart below best represents the relationship between stress and productivity in the workplace. As seen in the chart both high and low levels of stress equate to very low productivity levels for employees in the workplace. While just enough stress creates very productive employees. This tends to be because employees are worried about the possibility of losing their jobs so they work hard in order to keep the job but are not so worried that they think it will happen tomorrow and become burned out.
Answer:
14a + 20
Step-by-step explanation:
8(a + 2) + 2(2 + 3a)
expand the bracket
8a + (8*2) + (2*2) + (2*3a)
8a + 16 + 4 + 6a
bring like terms together
8a + 6a + 16 + 4
14a + 20
For the more amount of the time the larger it will grow.
The data-set that places 22.6 as an outlier is given as follows:
2.4, 5.3, 3.5, 22.6, 1.8, 2.1, 4.6, 1.9
<h3>When a measure is considered an outlier in a data-set?</h3>
A measure is considered an outlier in a data-set if it is very far from other measures, especially in these two cases:
- If the measure is considerably less than the second smallest value.
- If the measure is considerably more than the second highest value.
In this problem, he data-set that places 22.6 as an outlier is given as follows:
2.4, 5.3, 3.5, 22.6, 1.8, 2.1, 4.6, 1.9.
The second highest value is 5.3, which is considerably less than 22.6, hence 22.6 is an outlier in the data-set.
More can be learned about statistical outliers at brainly.com/question/9264641
#SPJ1
When a zero of a function does not cross the x-axis but touches it, this means that the zero is a "double root". It has two of the same factor (x - 4)^2 and two of the same zeros, x = 4 and x = 4
f(x) = x^2 - 8x + 16 would be the function with a double root at 4