Start at the point (2, -3) and then go up 3 and to the right 4 a few points and then go down 3 and to the left 4 a few points and then from there you can get an equation out of it
$15 x .0725 = 1.0875 which we have to round to $1.09
Notice how I changed the 7.25% to a decimal .0725 by moving it back two places.
Answer:
the question is cutoff. please rewrite the question. please write exponents as 6x^2.
First, let's make these two into equations.
The first plan has an initial fee of $40 and costs an additional $0.16 per mile driven.
Our equation would then be
C = 40 + 0.16m
where C is the total cost, and m is the number of miles driven.
The second plan has an initial fee of $51 and costs an additional $0.11 per mile driven.
So, the equation is
C = 51 + 0.11m
where C is the total cost, and m is the number of miles driven.
Now, your question seems to be asking for one mileage for both, equalling one cost. I would go through all the steps I've taken to try and find this for you, but it would probably take hours to type out and read. In short, I'm not entirely sure that an answer like that is possible in this situation, simply because of the large difference in the initial fee of the two plans, along with the sparse common multiples between the two mileage costs.
1.95 = .21(5) + .06m
1.95 = 1.05 + .06m
Solving (if needed)
Subtract 1.05 from each side
1.95 - 1.05 = .06m
.90 = .06m
Divide .06 on both sides
15 = m