Answer:147,000 J
Step-by-step explanation:
Just did on apex
Let X = the 29% alloy and Y = the 60% alloy.
They want a total of 80kg, so you have X +Y = 80
Rewrite that to get X = 80-Y
You also want 0.20X + 0.60Y = 0.52(80)
Replace X with 80-y:
0.20(80-y) + 0.60y = 0.52(80)
Simplify:
16 - 0.20y + 0.60y = 41.6
Combine like terms:
16 +0.40y = 41.6
Subtract 16 from each side:
0.40y = 25.6
Divide both sides by 0.40
y = 25.6 / 0.40
y = 64
Now you have Y replace y with 80 in X = 80-Y
X = 80 - 64
X = 16
They need 64 Kg of the 60% alloy and 16 Kg of the 20% alloy.
So prime numbers are numbers which cant be divided by any number other than one and these are <span>2, 3, 5, 7, 11, 13, 17, 19, 23, 29, 31, 37, 41, 43, 47, 53, 59, </span>61<span>, </span>67<span>, </span>71,73<span>, </span>79<span>, </span><span>83
83+2 is 85
so the product is the two numbers multiplied together which is 166</span>
<span>rational number, real number
</span>