1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
krek1111 [17]
3 years ago
5

Round 37,218 to the nearest ten thousand. Show your work

Mathematics
1 answer:
tensa zangetsu [6.8K]3 years ago
6 0
The answer is 36,000 because it is not over 36,500
You might be interested in
Indicate the equation of the given line in standard form.
Ganezh [65]
Since the slope stays the same as it's parallel, we have y=(3/4)x+b. Plugging (2,-1) in, we get -1=3*2/4+b=6/4+b=1.5+b. Subtracting 1.5 from both sides, we get -2.5=b and our equation being y=(3/4)x-2.5 (since in y=mx+b, y and x remain as variables)
8 0
3 years ago
Pls help me with this maths question ​
VikaD [51]

Answer:

a.7/4x

b.2/3c

Step-by-step explanation:

4 0
2 years ago
Plllllplzzzzzzzzzzzzzzzzzzzzzzzzzz
Natalija [7]

Hello there!

The answer would be C since we are looking to find how far she ran based on the amount of miles that has passed.

As stated above, 6 minutes. However to find out how far she runs we have to change the speed to miles per minute.

6 minutes per mile is equal to 1/6 of a mile per minute

Formula for Distance is speed x time

The distance is d, the time is t and the speed is 1/6.

Plug it in:

d = 1/6t

Lastly, multiply by 6 on both sides.

d x 6 = 1/6t x 6

1/6 x 6 = 1t

6d = 1t

Answer: t= 6d

5 0
3 years ago
george completed 3/5th of work in 9 days with the help of paul he completes remaining work in 4 days.In how many days paul alone
IRINA_888 [86]
If George completed 3/5 of work in 9 days, it means that he needs 3 days to finish 1/5th of the work.

The remaining part is 2/5 because 1-3/5=2/5. 2/5 is also 6/15

From this, how much did George do? in the first 3 days he did 1/5th and then one more day was left, during which he did 1/5/3=1/15th.

So he did in total 1/15+1/5=1/15+3/15=4/15.
this means that Paul did the rest of 6/15, so Paul did 6/15-4/15=2/15.

So we know that he does 2/15 in 4 days, which means that every two days he can do 1/15 of the work

so he would need 15 times 2 days to finish the work - 30 days!
6 0
3 years ago
Identical sweaters are on sale in two different stores. The sale price in store A is 30% off the regular price of $25. The sale
bekas [8.4K]
30% off 25: multiply 25 by .30 to find 30%: 7.5. Now subtract that from the sales price: 25-7.5=17.5
Do the same for store B: .40•30=12. 30-12=18.
So store A is better by $.50 :) hope this helps :)
7 0
3 years ago
Read 2 more answers
Other questions:
  • Solve for x. will give brainlkest
    12·1 answer
  • If you solve this i will give you brainlist<br> 2+2=x solve for x
    6·1 answer
  • $2,200 people enter an amusement park every hour. How long will it take for 6,600 people to enter the park ?
    9·2 answers
  • Simplify square root of 72 by using imaginary number I
    6·1 answer
  • Sara and Lane share a 30-ounce box of cereal. By the end of the week, Sara has eaten 1 10 of the box, and Lane has eaten 2 5 of
    13·1 answer
  • Please help me please help me if you don't know gently move your hand
    6·1 answer
  • Please answer my question please
    8·2 answers
  • THIS IS REALLY URGENT, PLEASE GIVE ME AN ANSWER.
    13·1 answer
  • Hey i need help thank you!
    7·1 answer
  • A picture is 10 inches by 14inches. The frame measures 2 inches longer and wider than the painting. What is the area of the fram
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!