1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Ne4ueva [31]
3 years ago
13

Which is a stretch of an exponential decay function?

Mathematics
2 answers:
aliya0001 [1]3 years ago
9 0

Answer:

The correct answer is C. f(x) = 5/4(4/5)^x

Just took the test.

Step-by-step explanation:


Aleksandr-060686 [28]3 years ago
6 0
The answer 

for such a question, it is required to graph each function, the answer is 
<span>f(x) =4/5(4/5 )^x 
check the attached file for proof</span>

You might be interested in
Please answer accurately and show work if you can
scoundrel [369]

Answer:

A. a - 3 ≤ -5

Step-by-step explanation:

Move all terms with a to the right side of the inequality

7 0
3 years ago
Sofia packs 84 crackers equally into six boxes how many crackers are in each box
Rashid [163]

Answer:

14

Step-by-step explanation:

divide 84 by 6 equals 14.

5 0
3 years ago
Read 2 more answers
Is 8.25 lbs more than 8.225 lbs
den301095 [7]

Answer:

yes

Step-by-step explanation:

8.25 would be since in the 0.05 would be larger than 0.02

6 0
3 years ago
Easy questions! I will give brainliest! Tysm!
ziro4ka [17]

Answer:

Step-by-step explanation:

  area square = side²

(3/5)²

√(1/16)

√(1/16)

√(1/16)

4 0
3 years ago
A pump can fill a swimming pool in 8 hours. The pool also has a drain that can empty the pool in 10 hours. If someone turns on t
cluponka [151]

Answer:

40 hours will it take for the pool to fill.

Step-by-step explanation:

A pump can fill a swimming pool in 8 hours.

Work done by pump to fill in 1 hour is  \frac{1}{8}

The pool also has a drain that can empty the pool in 10 hours.

Work done by pump to drain in 1 hour is  \frac{1}{10}

If someone turns on the pump to fill the pool, but forgets to shut the drain.

Work done by both pipe in 1 hour is

W=\frac{1}{8}-\frac{1}{10}

W=\frac{10-8}{80}

W=\frac{2}{80}

W=\frac{1}{40}

Both pipe filled \frac{1}{40} part of pool in hours = 1

Both pipe filled complete pool in hours = \frac{1}{\frac{1}{40}}=40

Therefore, 40 hours will it take for the pool to fill.

7 0
3 years ago
Other questions:
  • What is a realistic mean and median for the distribution in this box plot?
    11·2 answers
  • Find the real numbers x and y that make the equation true (5-2i)-7=x-(3-yi)​
    6·1 answer
  • When it comes to equity, what does it mean to have negative equity or be
    12·2 answers
  • On a coordinate plane, the x-axis is labeled Turkey hot dogs and the y-axis is labeled dollars. Points (2, 1) and (4, 2) are plo
    12·2 answers
  • Please help!!!! I'll give crown
    11·2 answers
  • PLEASE HELP!! I'LL GIVE BRAINLIEST!!<br> Vikram is studying the square pyramid below.
    5·1 answer
  • Francis borrowed $20 from his dad in the morning. Later, he gave his dad 8
    11·2 answers
  • 3
    10·1 answer
  • Sandra bought 4 pounds of sweet potatoes for $5.36. What is the cost per pound of
    8·2 answers
  • Pleaseee helP
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!