1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
denpristay [2]
3 years ago
8

Algebra:please answer #1 and show work

Mathematics
1 answer:
Novay_Z [31]3 years ago
4 0
So 12 mins to 600 feet
35 mins=1900 feet
find the slope which is change in top over change in bottom (aka slope) so to find do
(y1-y2)/(x1-x2)
we want, per minute, so put the time as x1 and x2
x1=12
y1=600
x2=35
y2=1900
subsitutte
(600-1900)/(12-35)=-1300/-23=56.5 per minute
the answe ris 56.5 feet per minute or the last answer
You might be interested in
I NEED THIS RIGHT NOW ASAP PLEASE
nevsk [136]

Answer:

1:4

Step-by-step explanation:

3 0
3 years ago
Read 2 more answers
L.) How do you construct congruent segments, segment bisectors, angles, and angle bisectors using tools such as a compass and a
kondor19780726 [428]

Answer:  

Construction of congruent segment: First we take the measurement of the line segment with help of marked scale or a compass, then by pointing the measurements we can get the congruent line segment.

Construction of congruent angle:

Step 1: Make two congruent segments,

Step 2: Adjust compass in a fixed length.

Step 3: Make an angle on any side of one segments with help of compass,

Step 4 : Again, make an angle on any side of the another segment with the same adjusted compass.

Construction of segment bisector,

Step 1: First place the compass on the one end of the segment,

Step 2: Adjust the compass approx to the half length of the segment,

Step 3: Draw arc above and below to the segment,

Step 4: Now, go the other end and by the same length draw two arcs by crossing the previous arcs.

Step 5: join the above and below crossed marks.

Construction of angle bisector:

Step 1: Place the compass on the vertex of the angle,

Step 2: Adjust the compass in any length,

Step 3: Make an arc in one segment of the angle and from that arc again Make an arc above the angle

Step 4: Make an arc of the same length in the another segment by the same vertex and crossed the arc made above the vertex.

Step 5: join the point of crossing and the vertex of the angle.

3 0
4 years ago
A fountain on a lake sprays water in a parabolic arch modeled by the equation y = −0.4x2 + 3x, where y is the height in feet and
sweet [91]
Hello,
Please, see the attached files.
Thanks.

6 0
3 years ago
Read 2 more answers
Publix sells apples and oranges for $0.79 per pound. Marc puts 1.2 pounds of oranges in his cart then adds some apples. The tota
finlep [7]

Answer:

D

Step-by-step explanation:

you have to multiply .79 to both a and 1.2. A is wrong because it's saying we need to multiply .79 to 1.2lb. which is the weight of oranges and the total cost of apples and oranges which is 6.27.

4 0
3 years ago
Two constructors working together finished building a room in 6 days. how long would it take for each constructor to build the r
Gekata [30.6K]
It would take one construction worker 9 days and the other 18 days.

Let x be the number of days the first construction worker takes to build the room by himself.  If x were 2, he could build 1/2 of the room in the time limit, etc...so 1/x will be the portion of the room he can build by himself in the given tie limit.

The second construction worker can build 1/(x+9) of the room by himself in the given time limit.

Together, we have the equation 
1/x(6) + 1/(x+9)(6) = 1

[The speed of the first contractor times the number of days, and the speed of the second contractor times the number of days; together they build 100% of the room]

This gives us

6/x+ 6/(x+9) = 1

We will multiply everything by x to get it off of the denominator:
6/x(x) +(6/(x+9))(x)= x
6 + 6x/(x+9) = x

Multiply everything by x+9 now:

6(x+9) + (6x/(x+9))(x+9) = x(x+9)
6x + 54 + 6x = x² + 9x
12x + 54 = x² + 9x

Subtract 12x from each side:
12x + 54 - 12x = x²+9x-12x
54 = x²-3x

Subtract 54 from each side:
54-54 = x²-3x-54
0 = x²-3x-54

This factors easily; -9(6) = -54 and -9+6 = -3:
0 = (x-9)(x+6)

Using the zero product property we know either x-9=0 or x+6=0; this gives us x=9 or x=-6.  Negative time makes no senses, so x=9 hours.

This means the slower contractor takes 9+9 = 18 hours.
5 0
4 years ago
Read 2 more answers
Other questions:
  • A large cheese pizza cost 18 dollars. Each topping you add on costs 1.50 dollars plz answer
    15·2 answers
  • HELP PLEASE WILL MARK BRAINLIEST NEED THIS DONE ASAP OR I FAIL 50 POINTS!
    9·1 answer
  • How far a plane to if it travel at 450km/hr for 5 hour and 15 minutes​
    14·2 answers
  • What are the values of a, b, and c in the quadratic equation 0 =1/2x² - 3x - 2?
    9·1 answer
  • What is the total area
    8·2 answers
  • Y-3=5(x+1) convert from point slope to standard form
    14·1 answer
  • Which of the following is a rational number?<br> 148, 49, 50, 51
    13·2 answers
  • Help me please!! i wasn’t at school the day so help meee
    5·2 answers
  • Help me with my math quiz from friday 4/1 <br> SHOW STEPS
    11·1 answer
  • Find the area of the parallelogram 300 in^230 in^260 in^250 in^2
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!