1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Rasek [7]
3 years ago
7

Given the function y-4=5/6(x-2), complete the table of values by entering the missing value.

Mathematics
1 answer:
mylen [45]3 years ago
6 0
The first thing you do is substitute 9 for y in the function, which is,

9 - 4 = 5/6 (x - 2)

Then, you subtract on the left side

5 = 5/6 (x - 2)

Then, you multiply by 6 on both sides

30 = 5 (x - 2)

Then, divide both sides by 5

6 = x - 2

Then, at 2 on both sides to isolate x
& your final answer is

x = 8 (this would be the missing value)
You might be interested in
Write and solve a real-world problem that can be modeled by the equation 0.75x-18.50=0.65x Finding X the variable
Lubov Fominskaja [6]
I got x=185

0.75(185)-18.50=0.65(185)

120.25=120.25
6 0
3 years ago
Read 2 more answers
Why was Florence such an ideal city for artistic expression? a. Most artists were born in Florence. b. Florence promoted economi
iren2701 [21]

Answer:

B. Florence promoted economic and social freedom

Step-by-step explanation:

Edgenuity 2020

4 0
3 years ago
Read 2 more answers
American Vending (AV) supplies vended food to a large university. Because students often kick the machines out of anger and frus
aev [14]

Answer:

case 2 with two workers is the optimal decision.

Step-by-step explanation:

Case 1—One worker:A= 3/hour Poisson, ¡x =5/hour exponential The average number of machines in the system isL = - 3. = 4 = lJr machines' ix-A 5 - 3 2 2Downtime cost is $25 X 1.5 = $37.50 per hour; repair cost is $4.00 per hour; and total cost per hour for 1worker is $37.50 + $4.00

= $41.50.Downtime (1.5 X $25) = $37.50 Labor (1 worker X $4) = 4.00

$41.50

Case 2—Two workers: K = 3, pl= 7L= r= = 0.75 machine1 p. -A 7 - 3Downtime (0.75 X $25) = S J 8.75Labor (2 workers X S4.00) = 8.00S26.75Case III—Three workers:A= 3, p= 8L= ——r = 5- ^= § = 0.60 machinepi -A 8 - 3 5Downtime (0.60 X $25) = $15.00 Labor (3 workers X $4) = 12.00 $27.00

Comparing the costs for one, two, three workers, we see that case 2 with two workers is the optimal decision.

3 0
3 years ago
Estimate the product<br> A)Close to 40<br> B)Close to 004<br> C)Close to 0.4<br> D)Close to 4
PtichkaEL [24]
Close to 0.4 aka c :))
7 0
3 years ago
Read 2 more answers
If Matthew decided to put his $10,000 underneath the mattress, what is his future value of that money worth after forty years la
sveticcg [70]

Answer:

Step-by-step explanation:

$2,909

8 0
3 years ago
Other questions:
  • There are 9.5 ounces of juice in a container. An additional 1.75 ounces of juice are poured into the container each second. How
    11·2 answers
  • Vanessa earns a base salary of $400 every week with an additional 5% commission on everything she sells. Vanessa sold $1850 wort
    6·1 answer
  • Moving the decimal point to the right 4 places in a number is the same as _____.
    15·2 answers
  • The vertex of the graph of f(x) = (x - 3| + 6 is located at
    15·1 answer
  • Need help with these two questions no work needed just he answer thank you
    10·1 answer
  • Help me please and no links
    12·2 answers
  • 5.<br> Determine the length of the missing side, if possible.<br> B<br> 8<br> a<br> A<br> 3
    11·2 answers
  • Srry for the others tabs but can you answer these pls
    10·2 answers
  • Hi, I need help with this story problem.
    8·1 answer
  • Write two expressions (with at least two terms each) that when added together have a sum of -4n + 6.
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!