Answer:
Risk management is the technique that is used for managing the risky situation so that security of the system or organization can be maintained. The risk can be reduced by parameters like monitoring the system,alertness, preventive measures etc. There are terms related with the risk management for prevention of the risk such as risk control ,risk identification and risk assessment .
- Risk control is the method that is used for calculating the loss or damage experience and then taking the correct measures to reduce the loss and thus, controlling the risk.
- Risk assessment is the analyzation of the threats and source of damage/loss that is caused or can be caused by assessing the whole process and functioning.
- Risk identification is the technique through which the threat is listed over a document and sorted in accordance with the category of risk, risk response etc.
Answer:
When designing a cache, you have to consider this things:
If the cache has a bigger block size may have a lower delay, but when miss the miss rate will be costly. If an application has high spatial locality a bigger block size will do well, but programs with poor spatial locality will not because a miss rate will be high and seek time will be expensive.
Geographically, the state of Ohio falls within the lines of latitude of 75 °W and 90 °W. The timezone corresponding to this portion of the globe is eastern standard time (EST). The prime meridian at 0 °, has the timezone greenwich mean time (GMT) from which all other timezones are referenced. And eastern standard time, local time in Ohio, will be 5 hours behind GMT.
An effective team leader shows great skills in every area, shows great support and respect to his teammates and is very easy to get along with.