During the maintenance phase of the sdlc, the team must take the correct action if a system's objectives are not being met
<h3>What are the 5 phases of the traditional SDLC Software Development process)?</h3>
Software process is the set of activities that constitute the development of a computer system. These activities are grouped into phases, such as: requirements definition, analysis, design, development, testing and deployment.
The main focus of this phase of the SDLC is to ensure that the needs continue to be met and that the system continues to function as per the specification mentioned in the first phase.
See more about SDLC at brainly.com/question/14096725
#SPJ1
Answer:
please check this images that are below
Explanation:
Answer:
a modular router
Explanation:
A modular router is a type of router that will provide multiple slots, this will enable the network engineer to either change or increase the number of space the router has.
A layer 3 switch cannot provide a WAN connectivity even though it can increase the number of ports on a router. The concept of PoE capability of any device have nothing to do with the number of ports it has. If the Engineer decides to use another fixed configuration router it will still lead to the same problem in the future because it cannot guarantee or provide the flexibility of future growth adaptation which can be given by a modular router if put in use.