Answer:
Repair damage done to original systems
Explanation:
It is imperative that businesses brace up for moments or period of challenges whereby normal operation is impeded due to disruption in standard system condition. The ability of businesses to thrive and continue to deliver in these circumstances is catered for by the business continuity plan. The recovery team ensures that important processes critical to the business are restored in other to ensure that business operation isn't crippled. Once normalcy ahs been restored, the team ensures recoverabke day in the original system are taken care of. The repair of damage done is not a goal of the recovery ohase in the business continuity plan as repairsvare catered for after recovery event has been finalized.
What is it about ? And what you need help on
A user can add a shadow to a table on Power Point presentation, b<span>y choosing the Layout tab under Table Tools, clicking on Effects, and selecting Shadow. The shadow can be inner, outer or perspective. The most commonly used is outer shadow.
</span>Adding a shadow behind the table will make the <span>data table to stand out on the screen and help bring the viewer’s attention.
Shades can be added also on text, tables, pictures inserted in the presentation and other object. </span>
Answer:
#Function for the calculcations needed
function subtotal_gratuity_total(subtotal,gratuity_rate):
gratuity_rate = gratuity_rate/100 #this is assuming the user enters the gratuity as a percentage value (e.g. 15)
gratuity = subtotal*gratuity_rate
total = subtotal+gratuity
return subtotal, gratuity_rate, gratuity, total
#Reading the values the user enters
Output(“Input subtotal”)
input (subtotal)
Output(“Input gratuity rate”)
input (gratuity_rate)
#Calling function we created with the values the user enters as inputs,
#and the 4 values required as outputs
subtotal,gratuity_rate,gratuity, total = subtotal_gratuity_total(subtotal,gratuity_rate)