Answer:
a. The percentage of vehicles who pass through this construction zone who are exceeding the posted speed limit =90.82%
b. Percentage of vehicles travel through this construction zone with speeds between 50 mph and 55 mph= 2.28%
Step-by-step explanation:
We have to find
a) P(X>40)= 1- P(x=40)
Using the z statistic
Here
x= 40 mph
u= 44mph
σ= 3 mph
z=(40-44)/3=-1.33
From the z-table -1.67 = 0.9082
a) P(X>40)=
Probability exceeding the speed limit = 0.9082 = 90.82%
b) P(50<X<55)
Now
z1 = (50-44)/3 = 2
z2 = (55-44)/3= 3.67
Area for z>3.59 is almost equal to 1
From the z- table we get
P(55 < X < 60) = P((50-44)/3 < z < (55-44)/3)
= P(2 < z < 3.67)
= P(z<3.67) - P(z<2)
= 1 - 0.9772
= 0.0228
or 2.28%
Answer I think it's 24/1 because if you solve the equation it's 24.
Step-by-step explanation:
Y=<span>5 is your answer. Hope this helps :)</span>
Answer:
9 5/7
Step-by-step explanation:
You add all the 13/14 then divided it by 14
Then add all the while numbers then add then add them all together
Answer: 7
Step-by-step explanation:
1. multiply both sides by -6 so the -6 on the right side could cancel out and the left side would be -6: 1= a-13/-6 ==> -6=a-13
2. add both sides by 13 so -13 on the right side could cancel out and the left side would be -6+13: -6=a-13 ==> -6+13=a-13+13
3. you know -6+13 equals 7 right? so the answer is a=7