I divide 40 into 4 even groups
Answer:440.925
Step-by-step explanation:
If George completed 3/5 of work in 9 days, it means that he needs 3 days to finish 1/5th of the work.
The remaining part is 2/5 because 1-3/5=2/5. 2/5 is also 6/15
From this, how much did George do? in the first 3 days he did 1/5th and then one more day was left, during which he did 1/5/3=1/15th.
So he did in total 1/15+1/5=1/15+3/15=4/15.
this means that Paul did the rest of 6/15, so Paul did 6/15-4/15=2/15.
So we know that he does 2/15 in 4 days, which means that every two days he can do 1/15 of the work
so he would need 15 times 2 days to finish the work - 30 days!
<h3>
Answer: 20.3</h3>
Work Shown:
tan(angle) = opposite/adjacent
tan(B) = AC/AB
tan(67) = x/8.6
8.6*tan(67) = x
x = 8.6*tan(67)
x = 20.2603303460843 ... make sure your calculator is in degree mode
x = 20.3 .... rounding to 3 significant figures
see diagram below
Step-by-step explanation:
the slope of a line is the ratio y/x.
that means when going from one point to the other, how many units is y changing, when x changes a certain number of units.
so, going from one point to the other here, x changes by 30 units (from -12 to +18). and y changes 15 units (from -9 to 6).
therefore, the slope is
15/30 = 1/2