Answer:
It's the the 4th one. 6.3.3
(x+2)(4+y)(5+6)(2+x)(4+0.5x)
combine like terms
(x+2) (4+y) (11) (x+2) (4+.5x)
11(x+2)^2 (4+y)(4+.5x)
distribute
11(x^2 +4x+2) (16+4y+2x+.5xy)
(11x^2+44x+22)(16+4y+2x+.5xy)
5.5 x^3 y + 22 x^3 + 66 x^2 y + 264 x^2 + 198 x y + 792 x + 176 y + 704
Given that the cubical piece has side (s) 7 mm, and a cylindrical hole of diameter (d) as 3 mm.
The volume of the piece can be calculated as,

It is mentioned that the material costs $207 per cubic meter, so the cost (c) of 1 piece is calculated as,

This is the cost (in dollars) for 1 piece.
Given that the manufacturer wants to produce 1,000,000 such pieces, so the total cost (TC) is calculated as,

Thus, the total prototypes will cost around $60.75
It would be A because -2 times +6 equals -12
800/5 which is 160!!!!!!!!