The approximate distance between point p and q are 5.1 so the answer is D.
Answer:
square root 48
Step-by-step explanation:
It is square root 48 because it is between 7 and 8 not exactly if it was exactly 7 and 8 it would be square root 56
Answer: c=5.4
The two roots are 3/5 and 9/5
Step-by-step explanation:
assume 5x2−12x c=0 is supposed to be 5x^2 - 12x + c = 0
p = (12 + sqrt(144-20c))/10
q = (12 - sqrt(144-20c))/10
p-3q=0,
1.2 + 0.1sqrt(144-20c) +
-3.6 + 0.3sqrt(144-20c) = 0
-2.4 + 0.4sqrt(144-20c) +2.4 = 2.4
sqrt(144-20c) = 2.4/0.4 = 6
144-20c=36
144-36=20c
c = 108/20 = 5.4
5x^2-12x+5.4=0
x = 3/5 or x = 9/5
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
Answer:
What question? We need more context