40 wpm. Because 160/4=40.
I hope that helped!
Answer:
b. =8.5+1.96*3/SQRT(45), and =8.5-1.96*3/SQRT(45)
Step-by-step explanation:
Sample size (n) = 45
Sample mean (M) = 8.5 minutes
Variance (V) = 9 minutes
Z-score for a 95% confidence interval (z) = 1.96
A confidence interval is defined by the following expression:

Applying the given data:

Writing in Excel statements, the limits of the interval would be
=8.5+1.96*3/SQRT(45), and =8.5-1.96*3/SQRT(45)
Therefore, the answer is alternative b.
The edge represented by EA is the edge skewed to edge FG. Skew lines are non-intersecting lines in space. These lines are neither parallel nor they form right angles.
Remember Rise/Run
So in this one you would start at -7 on the y-intercept, and then go down one, and over to the right two.
82 = 4x-10
72 = 4x
x = 72/4
x = 18
she owned it for 18 days