Answer:
Step-by-step explanation:
Answer:
$616
Step-by-step explanation:
When you add all the values that were added to his account, he added $3,089.When you add all the values that he wrote checks for (subtracted), he took out $2,473. When you subtract 2,473 from 3,089, you get 616, which is how much money is left in his account.
1 1/16 is it's simplest form.
12)
(intro) Slope is change in y divided by change in x (axes). Here, the y axis is depth and the x axis is hours. So, the slope is change in depth between any two points, divided by the change in hours between the same points. The slope of this line is half a foot depth divided by 2 hours.
a) So, the slope is 0.5 / 2 = 0.25, or 1/4.
b) The graph shows a constant rate of change because the line is straight (it increases at the same speed. If the line was curving, it would not be a constant rate of change).
c) Yes, because the line has a constant rate of change now.
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.