Lifting a weight 10 times is a kind of ISOTONIC contraction. Holding a heavy machine part steady while securing it in place may be categorized as ISOMETRIC contraction. Lifting heavy cans and putting them on a shelf may be called an ISOTONIC contraction. Flexing your leg muscles and holding the flex is an ISOMETRIC contraction. Lifting your heavy book bag several times is good ISOTONIC contraction.
Answer:
Industrialisation usually requires the use of potentially polluting technologies which can generate waste products that can pollute the air, water and soil.
It is entirely up to both governments and the individuals undertaking the industrialisation to ensure that pollution is kept to an absolute minimum, preferably non-existent. However, this can sometimes add to the cost of the products produced so is often overlooked or ignored by both government, who want greater tax revenue, and the individuals, who want a higher profit, at the expense of the environment - often until it is too late to prevent severe damage.
1.- Institutional contingency planning, provides a general reference for humanitarian action, based on the mandate, policies, strategies, criteria and international and the intitution standards.2.-Analysis of hazards, vulnerability, capacity and the risks, adequate contingency planning should be based on the analysis of the risks that run the health center.3.-Determination and mobilization of resources, it is essential that the information about the capacity and resources is accurate and reliable, since this way the deficiencies and gaps can be determined and the use of existing resources optimized.4.- Early warning, warning systems and triggering factors. The contingency response planning process should establish the way to alert employees, and designate those responsible for notifying the others concerned.5.-Agreement and communication, the medical establishment should establish information management procedures within their contingency plans.6.-Sectoral responsibilities. Contingency plans must include a brief description of how they will address the needs in the different departments and the distribution of functions and responsibilities.7.-Salvage and health care, equipment formed to attend to any case of victims.8.- Announce the start and possible end dates of the contingency plan.9.- Recovery plan if needed.10.- The periodic revision of the contingency plan, to ensure that it is underway and does not need any change.