1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
alexira [117]
3 years ago
8

If George received $78.00 for his work and he gets paid 6 dollars and hour how much is he getting paid

Mathematics
2 answers:
swat323 years ago
8 0

13 hours 78÷6=13 hope it helps

Hoochie [10]3 years ago
7 0
13 hours 78/6=13
George was working for 13 hours
You might be interested in
A basketball team is down by 2 points with only a few seconds remaining in the game. There is a 60% chance that the team will be
Mashcka [7]

Answer:

This means that the coach should have the team going for the 2 point shot. There is a 36% probability of making the 2 point shot and winning overtime.

Step-by-step explanation:

We have these following probabilities:

A 60% probability of tying the game on a 2 point shot. In this case, the game goes to overtime, in which the team has a 60% probability of winning.

A 30% probability of making the 3 point shot and winning.

What should the coach do, go for the 2 point shot or the 3 point shot?

In which case the team has a higher probability of winning?

The team has:

A 60% probability of tying the game on a 2 point shot. In this case, the game goes to overtime, in which the team has a 60% probability of winning. So, going for the 2 point shot, the team has a 0.6*0.6 = 0.36 = 36% probability of winning.

Going for the 3 point shot, the team has a 30% probability of winning.

This means that the coach should have the team going for the 2 point shot. There is a 36% probability of making the 2 point shot and winning overtime.

7 0
3 years ago
Is there any way to post images on your questions?
AysviL [449]

yeah there is u should be able to by clicking on the paper clip                                          


7 0
3 years ago
1/4 (4x + 8)mi need help with this question
zepelin [54]
(4x+8)/4
(4x/4)+(8/4)
x+2
7 0
3 years ago
a road crew finished building a road.if the crew took 5 5/6 days how many kilometers of the road did they do each day
Leto [7]

Answer:

A construction crew has just finished building a road. The crew worked for 5 5/6 days. how many kilometers long, how many kilometers of road did they build each day? (Assume they built the same amount each day.) hope this helps  ; )

Step-by-step explanation:

4 0
3 years ago
The teacher kept track of how long it took students to finish a test. After 20 minutes, 3 students had finished the test.
spin [16.1K]
Well I would say 11 kids after 70 minutes
5 0
3 years ago
Other questions:
  • Properties to find the answer of 8x51
    9·1 answer
  • I need work shown. I can't figure these out
    7·1 answer
  • Which of these ordered pairs could not be a dilation of (8, -4)? (2, -1) (2, -2) (16, -8) (4, -2)
    10·2 answers
  • What is the equation graph below?
    15·1 answer
  • WILL GIVE BRAINLIEST TO THE CORRECT ANSWER!!
    11·1 answer
  • (a) Write the ratio 32 : 80 in its simplest form​
    15·1 answer
  • Sara measures and finds that she can do a vertical jump that is 27% of her height. If she is 63 inches tall, how high (in inches
    10·1 answer
  • Please guys solve Ex:4 ,i don't know it​
    5·2 answers
  • Help me ANSWER QUESTION 35 and 36 PLEASEEE THANK YOUUUU<3
    15·2 answers
  • Identifying functions worksheet
    9·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!