Answer:
depends on how much you already have...
Explanation:
Answer:
$166.8
Explanation:
Given that,
Units expected to produced = 400,000 units
Machine hours required = 1.2 each
Manufacturing overhead costs:
= Department 1 + Department 2
= $2,530,000 + $2,752,000
= $5,282,000
Total Machine hours:
= Department 1 + Department 2
= 30,000 MH + 8,000 MH
= 38,000 MH
Overhead cost per machine hour:
= Manufacturing overhead costs ÷ Total Machine hours
= $5,282,000 ÷ 38,000 MH
= $139 per MH
Overhead cost per unit:
= Overhead cost per machine hour × Machine hours required for each
= $139 per MH × 1.2
= $166.8
A foreclosure is a fee levied by your lender that represents pre-paid interest on your mortgage loan.
<h3>What is foreclosure?</h3>
foreclosure serves as the the action of taking in the possession of a mortgaged property in case they fail to meet up with mortgage payments.
In this case, A foreclosure is a fee levied by your lender that represents pre-paid interest on your mortgage loan.
Learn more about loan on:
brainly.com/question/26011426
#SPJ1
Answer:
Expected withdrawal is $45,000 for 30 years = total of $1,350,000
You will be required to invest in $25.063 every year.
Explanation:
By applying the goal seek formula in excel to determine the annual invested fund, based on a compounded interest rate of 6% over a duration of up to a maximum of 25 years from Year 0, we can clearly see that Savings ought to be $25,063 for every year.
The future Value of each saved fund is derived and added to future value of each years subsequent saved fund to arrive at a total expectation of $1,350,000 expected value after 25 years (i.e. $45,000 annual withdrawal x 30 years of withdrawal)
This brings total savings to $626,572 for the entire 25 years
Kindly refer to the attachment for breakdown of workings.