Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.
Answer:
mknod
Explanation:
When the user wants to configure a camera device on his Linux computer and the user recognizes that his device does not have a device-specific file. Thus, the user could use the mknod command on his computer to set up an equipment file because it is the command that is used to create a fresh file and these files are not the same as the normal file.
So, the following answer is correct according to the following scenario.
Answer:
one inch=25.4
12 meters=13.12
10 quarts=9.46
12 milliliters=0.0004
400 pounds= 181 kg
25 meters/second=82
68F=20C
Explanation:
heres the full ones
one inch=25.4
12 meters=13.1234 yards
10 quarts=9.46353
12 milliliters=0.000405768
400 pounds=181.437
25m/s=82.021f/s
68f=20C
I would say a calculator.
A burn-in test is a test which is usually performed on a system or component by running it for a long time in order to bring out any errors or system failures etc.
While doing it on CPU the data must be backed up as any kind of error or failure may result in the loss of data, at time systems can be repaired to retrieve data but still there is no guarantee, backing up is the best option.