Answer:
a. 0.38%
b. 266.75 days
Step-by-step explanation:
We have the following data, mean (m) 269 and standard deviation (sd) 15, therefore:
a. The first thing is to calculate the number z:
z (x) = (x - m) / sd
z (309) = (309-269) / 15 = 2.67
When looking in the normal distribution table (attached), we have that at this value of z, the probability is:
P (z> 2.67), that is to say we must look in the table -2.67 and this value corresponds to 0.0038, that is to say 0.38%
b. Find the z-value with a left tail of 44%, i.e. 0.44. We look in the table for this value and what value of z corresponds.
invNorm (0.44) = -0.15
Find the corresponding number of days:
x = z * sd + m
we replace
d = -0.15 * 15 + 269 = 266.75 days
Answer:
84+n=342
Step-by-step explanation:
you would subtract 84 from 342 to find the width since it is perimeter.
Answer:
About 20%
Step-by-step explanation:
The probability of a point on the un-shaded region will be given by;
Area of the shaded region/total area
Considering that the circles are of the same size, then the length of the square is 2d
Area of the square = 4d²
Area of the shaded = (4d² -4π(d/2)²
= 4d² -πd², but π = 22/7
= 6/7d²
Probability = (6/7d² ÷ 4d²) × 100%
= (6/28 d²) × 100%
= 21.42 %
Therefore; the answer is about 20%
Answer:
i dont know i am so sorry
Step-by-step explanation:
but good luck with it