Wilda can do the job in 4 hours ... she does 1/4 (or 0.25) of it each hour.
Karla can do it in 5 hours ... she does 1/5 (or 0.2) of it each hour.
Wilda worked alone for 1 hour ... 0.25 of the job was done before her helper
arrived. So only 0.75 of the job remained to be done together.
Working together, they accomplish (0.25 + 0.2) = 0.45 of the job in 1 hour.
How many times do they need to do 0.45 of the job in order to finish
the 0.75 of it that remains ? That's the number of hours it will take them,
working together.
0.75 / 0.45 = <em>1 and 2/3</em>
After Wilda worked alone for 1 hour and Karla came along to join her, it will
take them another <em>1 hour and 40 minutes</em> to finish the job and go for a swim.
If the slope is 0, then x does not change at all.
take the given y coordinate, and make that the equation.
so y=-9, since the line will never change.
Answer:
Slope = -2/2 = -1
x-intercept = 6/1 = 6
y-intercept = 6/1 = 6
I wasn't sure what you really were asking for, so I did slope, x, and y.
Answer: 
Step-by-step explanation:
Given : A biologist studied how cells grow by adding liquid protein to cell samples.
She divided
of an ounce of liquid protein evenly among 3 cell samples.
Here , total quantity of liquid protein =
of an ounce
Total cell samples = 3
Now , Quantity of liquid protein given by her to each cell = (total quantity of liquid protein ) ÷ (3)
=
.
Hence, Quantity of liquid protein given by her to each cell = 
Draw the graph of R = {(1,1), (2,2), (3,3), (4,4), (5,5), (1,4), (2,5), (4,1), (5,2)}
tresset_1 [31]
Answer:
Step-by-step explanation: