Try this explanation:
Note, in the 1st row given '9x', in the 2d one - '9(0)', then it means the substitution '0' instead of 'x'. In other words <u>x=0</u> !
answer: x-intercept is '0', y-intercept is '12'
Answer: The area of the square is increasing at a rate of 90.4 m2/min (square meters/minute)
Step-by-step explanation: Please see the attachments below
Answer:
It takes 30 minutes
Step By Step:
The rate of Glenn in finishing a job would be equivalent to:
Rate (G) = 1
job / 20 minutes
While the rate of Veronika is:
Rate (V) = 1
job / x---> x is the unknown
Where 1 job for Glenn means completely cleaning his room while 1 job for Veronika means pulling out everything. Therefore the equation to use would be:
1 / 20 – 1 /
x = 1 / 60
The rate of
Veronika is subtracted from the rate of Glenn since Veronika is slowing Glenn
down. Solving for x:
Multiply both
sides by 60 x
(1 / 20 – 1 /
x = 1 / 60) * 60 x
3 x – 60 = x
2 x = 60
x = 30
Therefore it
takes 30 minutes for Veronika to pull everything out.
Answer:
5 miles
Step-by-step explanation:
because when u divide 10 and 2 you will get 5