Answer:
6 hours and 30 mins
Step-by-step explanation:
This is right answer because from 8:00 to 9:00 is 1 hour and each hour is 60 mins and each minute is 60 secs. I hope this helps and please give me the crown
Since if he gets the driveway done in 20 minutes he gets 1/20th of the driveway done in 1 minute (if x=20 then x/20=1 by dividing both sides by 20) and if his brother gets 1/12th of the driveway done in one minute, then if t represents the time it takes to shovel the driveway, t/20+t/12=1 driveway shoveled as 1/20+1/12=amount they can do in 1 minute, so t/20+t/12 is how much they can do in t minutes. Multiplying both sides by 20*12=240, we get 12t+20t=32t=240. Dividing both sides by 32, we get 240/32=7.5 minutes to shovel the driveway.
Answer:
0.75 is the answer
Step-by-step explanation:
6/8 is equivalent to 3/4
3 divided by 4 is 0.75
Since 6/8 is equivalent then it is also 0.75
Also 6/8 turn to 3/4 when both the numerator and denominator is divided by 2.
6 divided by 2 is 3
8 divided by 2 is 4
Answer:
The equation would be Y=-1/4X+5
And in the above pic , i have graph the line , too .
Good luck ^.^
Answer: 2.9025
Step-by-step explanation:
0.75 x 387/100
= 2.9025